Project Details

TUTOR PERINI AFFILIATES


General Contractor
Contract Amount: $1.2 Billion


Mechanical Subcontractor
Contract Amount: $148 Million

OWNER
Clark County Department of Aviation

LOCATION
Las Vegas, NV

ARCHITECT
PGAL

SIZE
1.9 Million Square Feet

COMPLETION
2012

Project Description

The 14-gate Terminal 3 includes an added terminal building with an elevated roadway structure fronting the听facility, over-roadway pedestrian bridges, underground automated transit system infrastructure, and an aircraft听ramp. The terminal has its own retail concessions, parking and ticketing.

The 1,900,000-square-foot terminal building includes a basement, three upper levels and roof-level听penthouses. The building houses a baggage handling system for outbound and inbound processing, and an in-line听explosives detection system for baggage screening. The building鈥檚 infrastructure is designed with extensive cabling听for software interfaces. Other features include dynamic and static signage, way finding systems and Voice-over-Internet Protocol (VoIP). The elevated roadway extends the length of the terminal 鈥 approximately 90 feet wide and听2,000 feet long. Construction of the elevated roadway included听a concrete box girder with cast concrete columns.

RELATED PROJECTS
LAS D Gates

Awards

2012 Project of the Year - Nevada Contractors Association & AGC

2013 Honor Award Winner - National Terrazzo & Mosaic Association, Inc.

2013 Merit Award for Architecture -听AIA Nevada

鈥淧erini's detailed planning, coordination and teamwork were essential to the successful completion of the quality facility that Terminal 3 is.鈥
Rosemary A. Vassiliadis
Director of Aviation
McCarran International Airport